Moorside Strategic Briefing

Moorside Strategic Briefing

Cumbria

NuGen

Share this:

The Brief

The document provides the preliminary functional and technical requirements (RIBA Stage 1) for the 28 nuclear and non-nuclear facilities in relation to the current Engineering Site Plan, Masterplan and Vision and Infrastructure of the Moorside site. This includes both specifications of standards of quality and a brief for the development of the project.

Concept

Our concept provides a clear and coherent set of architectural, access and environmental parameters for the development of each one of the building. The work aims at integrating high-quality architectural design with the essential engineering, safety and security requirements of the project.

02-Moorside-RIBA-1-Diagram-01__Web_1920_c100.jpg
02-Moorside-RIBA-1-Diagram-01__Web_1920_c100.jpg

Features

We use data-driven vehicle and personnel flow analysis to determine the optimal distribution of access and security points both site-wide and for specific buildings. This resulted in a reduction of man-hours and physical structures therefore improving overall efficiencies and environmental impact of the project.

03-Moorside-RIBA-1-Diagram-02__Web_1920_c100.jpg
03-Moorside-RIBA-1-Diagram-02__Web_1920_c100.jpg

Overview

Status
Ongoing
Value
£15bn
Size
100 Hectares